• Grey Twitter Icon
  • Grey LinkedIn Icon
  • Grey Facebook Icon
Screenshot 2019-03-29 at 08.06.47.png

Waitings Ltd, Moss Road, Cliburn, Penrith, Cumbria, CA10 3AL 

Blackpool Sewer Installation

Duration: 10 months

Installation of large diameter pipelines

Installation of 300m sheet piles

Construction of large attenuation basin