Berthing Pontoons

Duration 14 weeks

Installation of the dockside berthing pontoon at Victoria Quays.

Works included the construction and installation of the both the dockside steelworks and the lifting and installation of the pontoon itself. The pontoon is used daily for providing assistance and stores to the various offshore wind farm facilities on the East coast.